Selection

Inspections for the year 2000.

 

Period= 2000 (Inspection)

Inspection RegNo DateInspected Period Evaluation
  ABC123 2000-01-03 2000 OK
ABC123 1999-01-15 1999 OK
DFG456 2000-12-04 2000 FAIL
HIK123 2000-10-20 2000 OK
TOP111 2000-05-11 2000 OK

 

The result relation has the same attributes as relation Inspection.
Inspection RegNo DateInspected Period Evaluation
         

NextFrame