19.2.2010. First pieces cut. 3D with 3 axis CNC Keeping things straight. 20.6.2010. First visit to the party location to build the FOH. Sanding filling, sanding, filling... forever loop. Ready for painting. We managed to destroy a wasp nest while painting the cabs. The bees were able fix it overnight. 8mm polyethene feet done with CNC. A press to bend the feet. Watercut 6mm aluminium. A week before the party. First shipment of bass to the forest. 30.7.2010. Party begins in few hours. Sound crew after the party.Online Slideshows by VisualLightBox.com v3.2