The meeting began 14.15.
Were reviewed following documents:
Time table 14.20
Kalle considered that schedules of the project
will have a delay of two weeks.
Testing 15.30
Kalle considered that this document already complete
and is finished. It accepted for the project.
UI the 14.45
Preliminary documents are acceptable, but they need
to be turned definitive document.
These notes are only initial phase still.
It must more develop the designs of the interface,
and their drawings.
Cores 15.00
The description of the virtual processor needs to by more specified.
Jukka must implement the document, and specify content concretely.
Compiler 15.15
Kalle decided that the name of the class must be Compiler.
Input and output must itself modify of such form that
a method receives input, and the same method gives
back output in object form.
Also Kalle decided that the exceptions must handle
by different form.
Works for next reunion 2.3.2004.
Document was decided to review requeriment distributed
new works for the next meeting:
Kalle assumed to clarify localitation.
To Jukka input was delegated to him to manager definition.
To Sami element was delegated to him event and
the interface of the Web.
It was decided to divide the meetings in two days:
Tuesday 14.00 - 16.00 and
Fridays 14,00 16.00
Kalle decided to prepare for the meeting of day 12.3.2004.
- Review requeriments design (Alberto organizes the event).
- to review the time table.
- repasart SWOT.
The meeting finished 16.15.
|