Project groups meeting 2.3.2004

Date	2.3.2004 klo 14.00-16.00
Address	Helsinki, TKT:n / C477
Present	Kärkkäinen Kalle Tapani (president)
	Antti Tevanlinna        (director)
	Forsgren Jukka
	Marquinez Alberto
	Zhang Jianling         (secretary)
Absent	Sierla Sami Pekka     

	Meeting starting: 14:15

	All group members and instructor are coming, except Sami, 
	he has dentist’s appointment.

	Jianling is as a secretary instead of Sami, next meeting
	Sami will be a secretary.

	First Kalle leads the group to check the requirement document, 
	find out which don’t include design document. 
	It may agree with customer.

	Alberto explains compiler part of the design document, 
	especially in changing part. The compiler part is almost 
	completed, except some language errors will be need to fixed.

	Kalle explains the localization of Malan.  It will deal with 
	different languages and inputs.

	Jukka tells which parts are changed in the core design 
	compare the old one. It will have final version on 
	Friday meeting after making small changes.

	Next meeting, Kalle hopes the group has final version about 
	design document. Jianling will info Sami, we hope he will 
	have the user-interface document before Friday, which is 
	part of design document. We plan to review the design 
	document on next Tuesday meeting (9.3).

	
	The meeting ends at 16.05