Project groups meeting 16.3.2004

Date	16.3.2004 klo 14.00-16.00
Address	Helsinki, TKT:n / C477
present	Kärkkäinen Kalle Tapani (president)
	Antti Tevanlinna        (director)
	Forsgren Jukka
	Marquinez Alberto       (secretary)
	Sierla Sami Pekka
	Zhang Jianling      
absent
	- start meeting at 14.15
	- Kalle cleared upt the timetables to Design-documents.
	- Jukka finished the document until 23.3.04.
	- Must there be an implement on Disk-driver?
	- Kalle investigated if the Malan Application is
	  checked well.
	- Kalle made clear interface of all the elements.
	- It was pointed out that interface are not ready.
	- It was decided that Kalle will finish and send his
	  version to members.
	- Kalle will prepare the document until Friday.
	- Alberto will prepare first version of the Malan
	  Compiler until 25.3.04.
	- Sami will finish Avent Manager localisation document.
	- Kalle, Jukka, Sami and Jianling will check the possible
	  missing of the Design document.
	- Next meeting 19.3.2004 at 14.15
	- End of the meeting
	- The meeting ends at 16.00